NEWS CENTER

WBCSD SMP2.0 Sathorn Model Project — Final Report

[Sathorn Model, Sathorn Road, Bangkok, Sustainable Mobility]

This is a download page of Sathorn Model Project — Final Report.

What is in this page?

The report consists of 5 reports :

  1. Summary Report
    Summary Report

    https://drive.google.com/open?id=1cxOWsOAJQNZiNtjxeyp9BATVPvBN96Mj

  2. Traffic Flow Management                                             https://drive.google.com/open?id=1nOtK84BRKSfYm5JIZd2arFWNBP32wKj7
  3. Park and Ride                                                                  https://drive.google.com/open?id=1riGrWnnI54GbT0bUZBgsfEaTIk-up0qk
  4. Shuttle Bus                                                                       https://drive.google.com/open?id=1vMGgVsREU-MPS-LKh4Y6Xg23mJhke6ft
  5. Information System and Flexible Working Time     https://drive.google.com/open?id=11aC8mqoz_F-ZhoCKZYz8RfHAA738QoXe

What do we do in Sathorn Model?

Sathorn model selected 5 main measures to perform Social Experiments:

  • Traffic Management,
  • Park and Ride,
  • Shuttle Bus,
  • Information system, and
  • Flexible Working Time.